Gangway installation on the breasting island of the refinery ship loading facilities

The project included the installation of a gangway that connects the dolphin C to the platform of the Breasting Island. The damaged parts of the gangway were removed and transferred to the shore where the new sections were assembled and then were transferred and installed at the Breasting Island by a floating crane. In addition, the LPG vent line was restored and the necessary concrete blocks were cast.