The subject of this contract was the interconnection of the HELPE products loading /unloading facilities with the JETOIL’s storage terminal, with the construction of new pipelines, the relocation of equipment, new pig trap facility and the extension of the closed drain systems.
Construction of 8” pipeline from helpe refinery to the jetoil co. storage terminal in thessaloniki