Restoration works on the refinery breasting island and replacement of underwater pipe risers

The activities included various reinforcements of the fenders structures and replacement of thirteen (13) flanged risers 4”-14” of the underwater pipes, connecting the Breasting Island with the Shore terminal, along with hydrostatic tests at 28 bar. The project required the close cooperation of ROPI with specialized divers.